What termite protection for a new home actually costs — broken down by system type, slab size and site, and what pushes the price up or down. Written by a registered building practitioner.

Our service from $800
Short answer

With Vaastu Building Services, pre-construction termite management starts from $800, with the final price confirmed after we assess your plans and site. The cost depends mainly on the system specified, the size of your slab and perimeter, and your site conditions. Across the wider market, pre-construction termite systems for a new home commonly range from several hundred to a few thousand dollars depending on the system type and home size — which is why a fixed quote beats a generic figure.

What you're actually paying for

A pre-construction termite price is not just a chemical spray. A compliant job covers the full scope required under Victoria's termite protection requirements and AS 3660.1, which is why a proper quote is worth more than a headline number. It typically includes:

  • Site assessment and selection of the right AS 3660.1 system for your soil and design
  • Supply and installation of the system (chemical, physical barrier, reticulation, or a combination)
  • Perimeter treatment after the slab is poured and forms are stripped
  • The AS 3660.1 compliance certificate, as-installed documentation, and the durable notice

Those last items matter at settlement: your building surveyor, lender and home warranty insurer will ask for the certificate before practical completion.

How the System Choice Drives the Price

There is no single "termite price" — it depends on the method specified for your build. Here is how the main AS 3660.1 systems compare on cost.

Chemical Soil Treatment

$ · Lowest

A registered termiticide applied to the soil. Usually the most economical option for a standard residential slab, and effective for a number of years before retreatment is due.

Reticulation System

$$ · Mid

A pre-pour pipe network that lets chemical be topped up later without disturbing the slab. Higher up-front than a plain soil treatment, with ongoing recharge costs over the life of the home.

Physical / Installed Barriers

$$$ · Higher

Sheet membranes, stainless-steel mesh and graded stone built into the structure. A higher up-front cost, but no chemical retreatment, so the long-run cost can be competitive.

Combined Systems

$$$$ · Most

Chemical plus physical barrier for maximum protection on high-risk sites, complex slabs or multi-storey builds. The most thorough — and the most expensive — option.

What changes the price

Two new homes can be quoted very differently. The main factors are:

  • Slab size and perimeter — most systems are priced largely by the treated area and the length of the slab edge, so a bigger footprint costs more.
  • System type — as above, chemical, reticulation, physical and combined systems sit at different price points.
  • Soil and site access — reactive clay, rocky ground or tight access can add preparation time.
  • Build complexity — split levels, multiple penetrations and step-downs mean more detailing and more labour.

Why doing it before the slab is the cheap option

The single biggest way to control cost is timing. Under-slab components are designed to go in while the soil is still open, before the concrete is poured. Try to add comparable protection afterwards and the job means cutting and lifting concrete — far more expensive, more disruptive, and rarely as effective. Booking termite protection into the build program early, ideally alongside your slab-stage inspection, keeps it a small line item rather than a costly retrofit.

How we quote your build

We review your plans and site, recommend the appropriate AS 3660.1 system, and give you a fixed-price quote before any work begins — so there are no surprises and no vague "from" figures. Our pre-construction termite management service starts from $800, with the final price set by the system and the size of your build. Contact us early and we coordinate the installation with your builder's program.

Cost Questions Answered

How much does pre-construction termite treatment cost in Victoria?
With Vaastu Building Services, pre-construction termite management starts from $800. The final figure depends on the system specified, the size of the slab and perimeter, and your site conditions, so we confirm a fixed price after assessing your plans. Across the wider market, pre-construction termite systems for a new home commonly range from several hundred to a few thousand dollars depending on the system type and home size.
Why do termite treatment prices vary so much?
Price is driven mostly by the system chosen (chemical soil treatment, physical barriers, reticulation or a combination), the length of the slab perimeter and the treated area, soil type and site access, and overall build complexity. A small, simple slab on an easy-access site costs less than a large or split-level home on a difficult block.
Is it cheaper to install termite protection before or after the slab is poured?
Far cheaper before the pour. Under-slab components are designed to go in while the soil is still exposed. Adding comparable protection after the slab is down means cutting and lifting concrete, which is expensive, disruptive and rarely as effective, so booking the work into the build program early is the cost-effective path.
Does the price include the compliance certificate?
Yes. Our pre-construction termite management service includes the AS 3660.1 compliance certificate and as-installed documentation on completion, plus the durable notice fixed to the building. That documentation is what your building surveyor, lender and home warranty insurer require before practical completion.
How do you quote the job?
We review your plans and site, recommend the appropriate AS 3660.1 system, and provide a fixed-price quote before any work begins, so there are no surprises. Contact us early in the build and we coordinate the installation with your builder's program.

Get a Fixed-Price Termite Quote

Send us your plans and site address and we'll recommend the right AS 3660.1 system and quote a fixed price — coordinated with your build timeline.